Atherton Street Update for Daylight Utility Work

PennDOT

State College, PA – The Pennsylvania Department of Transportation (PennDOT) is alerting area drivers to a change in utility work along South Atherton Street in State College. Next week, Columbia Gas of Pennsylvania will perform gas line relocation work during daylight hours, October 25 through 29.           

The contractor will work from 7:00 AM to dusk each day. PennDOT expects vehicle and pedestrian traffic impacts between White Course Drive to Clay Lane, with flaggers on-site to assist with traffic movement as needed. PennDOT urges drivers to use caution through the area and build extra time into their travel plans.

This utility relocation work is part of the next phase of roadway improvement work on Atherton Street. Work on this new section will be similar to work done on the previous section.

The previous phase was completed in 2020 and featured phased work zones stretching from Aaron Drive to Park Avenue. Work included the relocation of numerous utility, water, and sewer lines. It also included drainage improvements, curbing, sidewalk and ADA compliant ramp installation, traffic signal upgrades, a new concrete median and paving.

Motorists are encouraged to “Know Before They Go” by checking conditions on more than 40,000 roadway miles by visiting www.511PA.com. 511PA, which is free and available 24 hours a day, provides traffic delay warnings, weather forecasts, traffic speed information and access to more than 1,000 traffic cameras.

511PA is also available through a smartphone application for iPhone and Android devices, by calling 5-1-1, or by following regional Twitter alerts accessible on the 511PA website.                                                                                                                          

Subscribe to PennDOT news in Cameron, Centre, Clearfield, Clinton, Elk, Juniata, McKean, Mifflin, and Potter counties at www.penndot.gov/District2.

Information about infrastructure in District 2, including completed work and significant projects, is available at www.penndot.gov/D2Results.

Find PennDOT’s planned and active construction projects at www.projects.penndot.gov.

Follow PennDOT on Twitter and like the department on Facebook and Instagram.

MEDIA CONTACT:  Marla Fannin 814-765-0423