2018 Contracts
- 2018-C1 Sycamore, W. Gatesburg, Tadpole, E. Chestnut, Pine Hall
- 2018-C2 Owens Drive and Myrtle Avenue
- 2018-C5 Cold In Place Pipe Lining
- 2018-C6 Curb and Ramp Upgrades
- 2018-C7a Fuel
- 2018-C7c Asphalt and Aggregate
- 2018-C8 Pavement Markings
- 2018-C9 Microsurfacing
- 2018-C10 Sealcoat Bike Paths and Parking Lots
- 2018-C13 Street Tree Planting
- 2018-C15 Street Tree Pruning
- 2018-C17 Vehicle Detection Upgrades
- 2018-C22 Tudek Barn Roof Replacement
- 2018-C28 Winter Street Maintenance